Mazda 626

1991-1998 of release

Repair and car operation



Mazda 626

+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. Petrol engines (1,6 and 1,8 liters)
   + 3.2. Petrol 4-cylinder engine (2 liters)
   - 3.3. Petrol V6 engine (2,5 liters)
      3.3.1. Introduction
      3.3.2. Technical characteristics
      3.3.3. Recommendations about repair
      3.3.4. Top dead point of the first piston
      3.3.5. Covers of heads of cylinders
      3.3.6. Springs, clamps and epiploons of valves
      3.3.7. Gas-distributing belt and asterisks
      3.3.8. Camshafts and pushers
      3.3.9. Inlet collector
      3.3.10. Final collectors
      3.3.11. Heads of cylinders
      3.3.12. Forward epiploon of a cranked shaft
      3.3.13. Oil pallet
      3.3.14. Oil pump
      3.3.15. Flywheel or leading disk
      3.3.16. Back epiploon of a cranked shaft
      3.3.17. Engine fastenings
   + 3.4. Partition of engines (1,6 and 1,8 liters)
   + 3.5. Partition of engines (2,0 and 2,5 liters of V6)
   + 3.6. Diesel engine of 2,0 liters
   + 3.7. Systems of electric equipment of the engine
+ 4. Heating and ventilation
+ 5. Fuel system
+ 6. Exhaust system
+ 7. Transmissions
+ 8. Coupling and semi-axes
+ 9. Brake system
+ 10. Running gear
+ 11. Body
+ 12. Electric equipment
+ 13. Electroschemes
+ 14. Good advice


Welx websitehttps://welx.net | Читаем интересное: https://myavto24.ru

3.3.11. Heads of cylinders

Removal

PERFORMANCE ORDER
1. Disconnect a wire of the minus plug of the accumulator.
2. Merge cooling liquid. Disconnect the top hose of a radiator from a branch pipe.
3. Remove airintaking branch pipes and the air filter. Remove an inlet collector.
4. Remove final collectors.
5. Remove the generator. Disconnect wires from spark plugs. Remove the breaker the distributor of ignition and the ignition coil.
6. Remove a gas-distributing belt, asterisks of camshafts, a natyazhitel of a gas-distributing belt and intermediate pulleys.
7. Remove camshafts and pushers of valves.
6. Unscrew bolts and remove a back cover of a gas-distributing belt.
7. Remove branch pipes of cooling liquid from heads of cylinders.
8. Unscrew bolts and disconnect plaits of wires from back parts of heads.
9. Using sequence, return sequence of a tightening, weaken in some approaches (on 1/4 turns) bolts of heads of cylinders. Prepare new bolts.
10. Remove heads of cylinders.

Installation

PERFORMANCE ORDER
1. Carefully clean and wipe solvent or acetone being joined surfaces of heads and blocks of cylinders.
2. Examine being joined surfaces on existence of cracks, deep scratches and other damages. At detection of above-mentioned damages the head is necessary for processing in a specialized workshop.
3. Clean openings of bolts of heads by means of suitable taps.
4. Establish new laying of heads.
5. Establish heads of cylinders.
6. Grease carvings of new bolts with a small amount of oil. Insert bolts and tighten them in the specified sequence, using the instructions given in subsection 3.3.2.
7. Establish the remained details in return sequence.